Home
About Us
Trucking
Over the Road
Oversized Load Transportation
Local Delivery
Warehousing & Distribution
Rigging
Industrial Rigging
Crane, Forklift, Boom Truck and Equipment Rental
Survey/Estimating/Engineering
Logistical Services
Case Studies
Electrical / Power
2.5 MW Emergency Generators
Transformer Replacement
Rooftop Substation
Base Building Transformers
Backup Generator Replacement
Hoisting 2MW Backup Generator
Cobble Hill Emergency Generator
Construction
West Street Bridge
Steel Erection Support
Mechanical/HVAC
UTC Fuel Cells
Rooftop Packaged Chillers
Centrifugal Chiller Replacement
Jacking Up Cooling Towers
Boiler Placement
Cooling Tower Hoisting
Miscellaneous
A Lift for a Lift
Telecommunications
Rooftop Equipment Shelter
Ground Shelter
Outdoor Equipment Platform
News & Articles
Careers
Resource Center
Contact Us
Case Studies
Welcome to the GTI Case Studies page. Here you can find some examples of our solutions at work
• Electrical/Power
Hoisting 2.5MW Generators
Rooftop Substation
Transformer Replacement
Base Building Transformers
Backup Generator Replacement
Cobble Hill Emergency Generator
•
Mechanical/HVAC
Rooftop Packaged Chillers
Centrifugal Chiller Replacement
Jacking Up Cooling Tower
Boiler Replacement
Cooling Tower Hoisting
Rigging UTC 400KW Fuel Cells
• Telecommunications
Rooftop Equipment Shelter
Outdoor Equipment Platform
Ground Shelter
• Miscellaneous
A Lift for a Lift
• Construction
West Street Bridge
Steel Erection Support
Corporate Headquarters, 2 Galasso Place, Maspeth, NY • 24-hr Phone (718) 456-1800 • Toll Free (800) 737-8726
|
Login
|
Register
Design by
Brandmoguls