Project Scope:
Transport and set this 23,000-lbs shelter onto the roof for a wireless telephone carrier.
When it was thought that the local roads were too difficult to navigate, the hill too steep to climb, and the entrance to the parking lot too narrow to get through, GTI was asked to take another look. Our skilled trailer drivers and riggers were able to overcome those obstacles, transport this shelter to the location, and lift it to the roof.